Project experience
B&P (Frederick Douglass) Tunnel
SPT, Vacuum Excavation, NQ Coring, and In-Situ Testing
Location
Baltimore, Maryland
Market
Rail and transit
Services performed
Soil Borings/ NQ Rock Coring/ Pressuremeter Testing/ Vacuum Excavation/ Geotechnical Data Reports/ In-Situ Test Interpretation
250+
deep borings throughout Baltimore City
NQ
rock coring and packer testing
Urban ROW
traffic control and right-of-way coordination
250+ borings throughout Baltimore City including vacuum excavation, utility location, NQ coring, packer testing, and traffic control.
E2CR completed over 250 deep borings to support the tunnel design effort, led Baltimore City right-of-way permitting, and prepared and implemented traffic control plans.