Project experience

B&P (Frederick Douglass) Tunnel

SPT, Vacuum Excavation, NQ Coring, and In-Situ Testing

250+

deep borings throughout Baltimore City

NQ

rock coring and packer testing

Urban ROW

traffic control and right-of-way coordination

Project summary

Scope and context

Project details

What E2CR delivered

Scope

250+ borings throughout Baltimore City including vacuum excavation, utility location, NQ coring, packer testing, and traffic control.

Outcome

E2CR completed over 250 deep borings to support the tunnel design effort, led Baltimore City right-of-way permitting, and prepared and implemented traffic control plans.